- Development Process to Optimize Design and Performance of Small Gasoline Engines GBP 11.00
- Options for Reducing the LCC of Public Buses using the VOITH DIWA Automatic Transmission GBP 11.00
- Performance Evaluation on the High Resistance Sintered Bushings within Cardan Joints through Simulating and Accelerated Conditions GBP 11.00
Subtotal (excluding shipping and tax) GBP 33.00