- Theoretical Consideration about Kinematics Analysis for the Transitory Moving Faze of the Car GBP 11.00
- Analysis Of The Public Transport For The Metropolitan Area Of Timisoara And Timis County GBP 11.00
Subtotal (excluding shipping and tax) GBP 22.00